Bright Kitchen Remodel
A dark, closed-in kitchen opened up with a new layout, island, cabinets and lighting.
Boone, NC · Serving the High Country

Services
Kitchens and bathrooms get the hardest use of any rooms in the house. We rebuild them to work better day to day, and we fix what's behind the walls while they're open.
Fast Response
Joseph will call you within 1 business day.
Kitchens & Baths
From cabinets and counters to a fully waterproofed shower, this is what a kitchen or bath project with us usually covers.
01
A good kitchen remodel starts with how you actually use the room: who cooks, where groceries land, where people gather while dinner is being made. From there we look at layout, storage, counter space and lighting. Sometimes new cabinets and counters in the same footprint are enough. Sometimes moving the sink, adding an island or taking out a wall makes a bigger difference than any finish upgrade.
We'll help you weigh those choices against your budget, and we'll be straight about which changes are expensive (moving plumbing and gas) and which are not.
For second homes and rental cabins around Boone and Banner Elk, the priorities shift a little: durable counters and flooring, cabinets that hold up to guests, and fixtures that are easy to find parts for. For a full-time family kitchen, storage and a layout that lets two people work at once usually matter most.
02
Most bathroom problems we see in the High Country come back to water: a shower that leaked behind the tile for years, soft subfloor around a tub, or a fan that vents into the attic instead of outside. When we remodel a bath, we take it down far enough to find and fix that damage, then waterproof the shower area properly before any tile goes up.
Ventilation gets the same attention. Homes here are closed up for much of the winter, and a properly sized exhaust fan, ducted to the exterior, is the difference between a bathroom that dries out and one that grows mildew.
If you're planning to stay in the house long-term, it's worth thinking about a walk-in shower, wider doorways or blocking in the walls for future grab bars while everything is open.
03
After a free on-site estimate, we settle the layout and choose materials. Cabinets, counters and some tile and fixtures can have long lead times, so we order early and schedule demolition around delivery dates rather than leaving you without a kitchen while you wait.
Plumbing and electrical work is done by licensed trades and inspected where required before walls are closed. We protect the rest of the house, clean up daily, and walk through the finished room with you before we call it done.
04
Moving plumbing, gas or walls costs more than keeping the existing layout. Cabinet construction, counter material and tile choice are the next biggest variables. Hidden damage found during demolition, such as rotted subfloor around an old toilet or tub, is common in older homes across Watauga and Avery counties, and we'll price that repair with you before doing it.
Our Work
Representative photoBoone · Kitchens & Baths
A dark, closed-in kitchen opened up with a new layout, island, cabinets and lighting.
Representative photoBanner Elk · Kitchens & Baths
A dated tub-and-shower combination replaced with a tiled walk-in shower and a new vanity.
Questions
For a typical remodel that keeps the layout, expect a few weeks without a fully working kitchen. Larger layout changes take longer. We aim to have cabinets and counters ordered before demolition so the room isn't torn out while we wait on deliveries, and we can often keep a sink or a temporary setup running for part of the job. Your estimate will include a timeline.
Yes, it's one of the most common bathroom projects we're asked about. It usually involves removing the tub and surround, repairing any water damage found underneath, moving the drain, waterproofing the new shower area and tiling it. A low or no-curb entry is often possible depending on the floor framing.
Yes. We'll talk through options that fit your budget and how you use the room, point out what holds up well, and tell you about lead times so your choices don't delay the job. You're welcome to pick materials yourself, too.
It's common in older kitchens and baths. If we find rot, mold or water damage once things are opened up, we stop, show you, explain the fix and the cost, and only proceed once you've agreed.
Explore
Get Started
Tell us about your project and we'll get back to you within 1 business day.

You'll be talking to
Joseph Moore
Owner, Moore Construction
“No call center and no salespeople. You deal with me from the first call to the final walkthrough.”
Call or text
Location
Hours
More Quality.More Care.
No obligation. No pressure.Just a straight answer about your project.